Projects
-
SAHMRI
02.2010 to 06.2013
This 200 million flagship research facility will house the SAHMRI headquarters and is being built alongside the New Royal Adelaide Hospital (NRAH). The world class research facility will house up to 675 researchers and will be developing and encouraging innovation and improvements in health services.
-
Adelaide Oval Western Stands Redevelopment
03.2009 to 01.2011
This $95 million project has increased the venue's capacity from 30,000 to 36,000 and includes major upgrades to facilities, and a spectacular and iconic 'diagrid' interlocking steel roof structure.
-
Coast to Coast Light Rail Project
01.2009 to 08.2010
The 2.8km extension of the Glenelg tram line from City West to the Entertainment Centre at Hindmarsh was officially opened in March 2010.
-
South Road ANZAC Highway Underpass
07.2007 to 12.2009
The South Road ANZAC Highway Udnerpass is part of a greater State Government scheme to transform South Road into a continuous non-stop route from the Southern Expressway to the Port River Expressway.
-
Northern Expressway
09.2008 to 10.2009
The Northern Expressway is a new 23 kilometre road with a pedestrian and cycle pathway linking the Gawler Bypass with Port Wakefield Road at a point about three kilometres north of the Waterloo Corner Road intersection.
-
Bakewell Underpass
07.2006 to 08.2008
Replacement of the 80 year old Bakewell Bridge on Henley Beach Road with an underpass.
-
Port River Expressway Stages 3 and 4
12.2005 to 08.2008
The final leg of the East-West Expressway connecting the Northern industrial areas of Adelaide and Salisbury with the main shipping berths of Port Adelaide, including two fully independent opening bridges.
-
Adelaide Showgrounds Goyder Pavilion
10.2007 to 08.2008
The $50 million development includes an 8,000sq/m exhibition space and 16,000sq/m outside entertainment area.
-
Tivoli Hotel Redevelopment
01.2007 to 04.2008
The Tivoli Hotel Redevelopment includes construction of an 8 storey apartment building in the Adelaide CBD consisting of 2 carpark festivals and 6 levels of apartments.
-
Place on Brougham
01.2006 to 12.2007
The redevelopment of Adelaide's Hotel Adelaide on Brougham Place is a landmark Woodhead residential project. Place on Brougham is the most luxurious and exclusive apartments ever seen in the Adelaide property market.
-
Glenelg Tramline Extension
03.2007 to 10.2007
The Glenelg tram line is being extended past the Morphett Street Bridge on North Terrace to pick up key passenger destinations in Adelaide's CBD.
-
University of South Australia: Hawke Building
07.2005 to 07.2007
This architectually unique building fronting North Terrace and Fenn Place will be a distinctive Adelaide icon when it is completed in 2007.
-
Millbrook Reservoir Upgrade
10.2005 to 03.2007
Upgrade to the Millbrook reservoir included strengthening of the downstream dam wall, widening of the spillway and installation of a new control weir.
-
Port Adelaide Grain Berth Wharf
03.2005 to 02.2006
The Port Adelaide Grain Berth Wharf project involved the construction of a grain wharf at Outer Harbor to accommodate extremely large Cape Class vessels.
-
Adelaide Airport New Terminal
12.2003 to 11.2005
Adelaide Airport's new terminal is state-of-the-art accommodating the needs of domestic, international and regional travellers across all airlines servicing Adelaide.
-
Cathedral Rocks Wind Farm
07.2004 to 06.2005
The Cathedral Rocks site is a remote coastal area located near the southern tip of the Eyre Peninsula in South Australia, about 30km south west of Port Lincoln.
-
Adelaide Oval Redevelopment
02.2003 to 08.2003
The redevelopment of Adelaide Oval, Eastern Works involved the construction of 3 new viewing stands with their associated services and amenities and the re-positioning of the eastern entrance.
-
Hindmarsh Island Bridge
10.1999 to 03.2001
The bridge, some 70km south east of Adelaide, crosses the Murray River and links Hindmarsh Island to Goolwa.