The new South Road underpass extends approximately 300 metres either side of Anzac Highway and was built by construction contractors AdelaideConnect: a joint venture between Thiess Pty Ltd. and Leed Engineering and Construction. Upgrade at this critical intersection has reduced congestion and improvde safety along South Road - Adelaide's busiest and most critical main arterial freight route. Construction activities started in July 2007 and were completed at the end of 2009. Engineering Surveys utilized 2 full-time survey parties on this essential infrastructure project employing the latest technology in Trimble Robotic Total Stations.

A fly through animation from the Adelaide Connect website is available here:
http://www.adelaideconnect.com.au/flythrough_hi.htm

  • South Road ANZAC Highway Underpass
  • South Road ANZAC Highway Underpass
  • South Road ANZAC Highway Underpass
  • South Road ANZAC Highway Underpass
  • South Road ANZAC Highway Underpass
  • South Road ANZAC Highway Underpass
  • South Road ANZAC Highway Underpass
  • South Road ANZAC Highway Underpass
  • South Road ANZAC Highway Underpass
  • South Road ANZAC Highway Underpass
  • South Road ANZAC Highway Underpass
Fast Facts
  • Project NameSouth Road ANZAC Highway Underpass
  • LocationAdelaide
  • BuilderAdelaideConnect
  • When07.2007 to 12.2009
  • DetailsThe South Road ANZAC Highway Udnerpass is part of a greater State Government scheme to transform South Road into a continuous non-stop route from the Southern Expressway to the Port River Expressway.