Gawler Rail Revitalization

The Gawler line revitalization has upgraded the track and key stations in preparation for electric trains on the Adelaide transport network in 2013.  The new rail network is faster, smoother and more reliable.

The track has been completely upgraded and includes replacement and refurbishment of existing steel rails, upgrading the track base and concrete sleepers.  Eleven level crossings have been upgraded, and a "turn-back" facility at Elizabeth provides more frequent services.

Engineering Surveys survey had up to 9 survey teams on this project  using Trimble S6 robotic total stations to great effect with rail crews and tamping machines slashing construction times significantly.

Fast FactsGawler Rail Revitalization
  • LocationAdelaide
  • BuilderTracksure
  • When09.2011 to 04.2012
  • DetailsThe Gawler line revitalization will upgrade the track and key stations in preparation for electric trains on the Adelaide transport network in 2013. The new rail network will be faster, smoother and more reliable.

Contact us
Call 08 8340 4469

Or email us below

What does 8 - 0 =
To help reduce spam mail, put your thinking cap on and answer the above question.

Project Gallery

See all projects

Association connections

  • Civil Contractors Federation Member
  • South Australia
  • Surveying and Spatial Sciences Institute
At Leed we know that we can rely on Engineering Surveys to provide us with prompt and efficient service. Having worked with us for many years they understand our needs as well as the needs of our Clients...
Paul Teakle, Leed Engineering and Construction