PROJECT
GALLERY

CLICK AN IMAGE TO ENLARGE

31-3-08 South Road ANZAC Highway Underpass 1-4-08 Drilling the soil anchors 4-4-08 Pre-measuring the T-beams in the factory 19-4-08 South Road ANZAC Highway Underpass 19-4-08 Lifting in the bridge beams
19-4-08 Lifting in the bridge beams 19-4-08 Lifting in the bridge beams 19-4-08 Lifting in the bridge beams 19-4-08 Lifting in the bridge beams 22-4-08 The southern bridge deck in place
1-5-08 South Road ANZAC Highway Underpass

SOUTH ROAD ANZAC HIGHWAY UNDERPASS

The new South Road underpass will extend approximately 300 metres either side of Anzac Highway and is being built by construction contractors AdelaideConnect: a joint venture between Thiess Pty Ltd. and Leed Engineering and Construction.  Upgrade at this critical intersection will reduce congestion and improve safety along South Road - Adelaide's busiest and most critical main arterial freight route.  Construction activities started in July 2007 and are scheduled for completion by the end of 2009.  Engineering Surveys currently has 2 full-time survey parties on this essential infrastructure project employing the latest technology in Trimble Robotic Total Stations.

A fly through animation from the Adelaide Connect website is available here:

http://www.adelaideconnect.com.au/flythrough_hi.htm