PROJECT
GALLERY

CLICK AN IMAGE TO ENLARGE

Tivoli Hotel Redevelopment Tivoli Hotel Heritage Music Hall Pouring the new footings Pouring the new footings Setting up the holding down bolts
17-6-07 Standing the precast panels 20-6-07 Erecting the columns 20-6-07 Erecting the columns 23-6-07 Erecting the columns 23-6-07 The Crane Tower
29-6-07 Installing the I-beams 11-07-07 Pouring Level 1 Slab 12-7-07 Setting out grids on level 1 12-7-07 Setting out grids on level 1 12-7-07 Setting out grids on level 1
15-8-07 Installing the level 2 I-beams 15-8-07 Installing the level 2 I-beams 17-9-07 Level 3 Structure Complete 16-9-07 Level 4 Structural Setout 24-9-07 Level 4 Structural Setout
5-10-07 Level 4 Precast Panel Installation 13-12-07 Pouring level 9 sloping slab 13-12-07 Pouring level 9 sloping slab 29-11-2007 Lifting in the final panels 16-12-2007 Final structure almost complete

TIVOLI HOTEL REDEVELOPMENT

The original heritage listed hotel building is to be restored and the new tower structure will be built over an existing heritage music hall at the rear of the original hotel.  The new building footprint is approximately 1000m2 and will incorporate Adelaide’s first carpark lift.  Engineering Surveys is involved in all elements of setout including piling and footings, structural steel and precast.

 